Home > Pavement Sealers > Coal Tar Sealers > Coal Tar Ultra Pavement Sealer

Coal Tar Ultra 

Coal Tar Emulsion Pavement Sealer

Factory Blended with Sand Added

  • Factory blended with water, aggregate and polymer
  • Ready-to-apply formula reduces job-site mixing and preparation
  • Fuel-resistant formula provides durable pavement protection
  • Durable, slip-resistant coating provides added traction
Coal Tar Ultra Pavement Sealer

Factory-Blended Convenience for Professional Sealcoating

SealMaster Coal Tar Ultra is a ready-to-apply coal tar emulsion sealer featuring a clay-stabilized formula designed to protect and beautify asphalt pavement.

Its ready-to-apply formula eliminates the need to add and mix materials at the jobsite.

Formulated to resist fuel exposure and everyday wear, Coal Tar Ultra provides long-lasting protection for asphalt surfaces. Coal Tar Pavement Sealer Ultra provides a slip-resistant finish that helps protect and beautify parking lots, driveways, shopping centers, airports and other asphalt pavement surfaces.

Features & Benefits

Factory Blended for Consistent Quality

  • Coal Tar Ultra is factory blended with water, aggregate and polymer to provide a consistent formula from batch to batch.

Ready to Apply

  • Coal Tar Ultra simplifies job-site preparation by eliminating the need to add and mix aggregate and other ingredients before application. Thoroughly mix the material, and it’s ready to apply.

Added Fuel Resistance

  • Coal Tar Ultra provides resistance to fuel exposure, helping protect asphalt pavement from spills and leaks.

Durable, Skid-Resistant Surface

  • Coal Tar Ultra is factory-blended with aggregate to create a durable, slip-resistant coating that provides added traction for pedestrian and vehicle traffic.

Deep, Rich Black Finish

  • Coal Tar Ultra restores faded asphalt with a deep, rich black finish, creating a clean, well-maintained appearance.

Recommended Uses:
  • Parking Lots
  • Driveways
  • Shopping Malls
  • Airports
  • And More!

Application Guidelines

SealMaster

Coal Tar Ultra Pavement Sealer

Coal Tar Emulsion Pavement Sealer
Surface Preparation

Proper surface preparation is essential for a long-lasting, successful sealcoat. For newly paved asphalt surfaces, allow a minimum curing time of four weeks under ideal weather conditions (around 70°F) before applying. All surfaces must be clean and free of loose material, dirt and dust.

Before Sealcoating:
  • Fill pavement cracks with SealMaster hot-pour or cold-applied crack filler
  • Treat grease, oil and gasoline stains with SealMaster PetroSeal or PrepSeal
  • Remove dirt, dust and loose material from the pavement surface
Mixing Procedures

Mix Coal Tar Ultra thoroughly before application. If needed, a small amount of water may be added to facilitate application.

Application

For optimum performance and durability, apply a minimum of two coats of Coal Tar Ultra.

A third coat may be applied in high-traffic areas such as parking lot entrances, exits and drive lanes for added durability. Allow each coat to dry thoroughly before applying the next coat. After the final application, allow 24 hours before opening the pavement to vehicle traffic.

Important:

Temperatures must be above 50°F during application and remain so for at least 24 hours afterward. Do not apply when rain is imminent or forecast.

Coverage

When properly mixed and applied, one gallon of Coal Tar Pavement Sealer Ultra will cover approximately 100-120 sq. ft. per coat or 11.1-13.3 sq. yd. per coat.

NOTE: Coverage rates may vary depending on the pavement age, porosity and application method.

Available Color:

Black

Find the Right Pavement Sealer for Your Project

Not sure which pavement sealer is right for your project? SealMaster’s highly trained professionals can evaluate your pavement, recommend the right products and determine the appropriate mix design for your application. Contact SealMaster today to schedule a free pavement inspection or speak with one of our professionals.