Sealcoating Specifications

SealMaster Coal Tar E-Z Stir Pavement Sealer Tech Data

SealMaster Coal Tar E-Z Stir Pavement Sealer – Asphalt Based Pavement Sealer

Product Description & Benefits
SealMaster Coal Tar E-Z Stir Pavement Sealer is a ready to use clay-stabilized coal tar emulsion pavement sealer fortified with sand for slip resistance. SealMaster Coal Tar E-Z Stir is designed to protect and beautify asphalt pavement.

Basic Uses
SealMaster Coal Tar E-Z Stir is designed to beautify and protect asphalt pavement surfaces including parking lots, airports, driveways, shopping malls, roadways, and more.

Composition
SealMaster Coal Tar E-Z Stir is a sand filled ready to use clay-stabilized coal tar emulsion pavement sealer fortified with special surfactants to promote superior adhesion and durability.

Sizes
SealMaster Coal Tar E-Z Stir is available in 4,000 gallon bulk tankers, 55-gallon drums, and 5-gallon pails.

Color
SealMaster Coal Tar E-Z Stir dries to a deep, rich black color.

Limitations
SealMaster Coal Tar E-Z Stir shall not be applied when temperature is expected to drop below 50°F at any time within a 24 hour period after application.

Technical Data
SealMaster Coal Tar E-Z Stir meets the performance requirements of ASTM D 5727, RP 355e, and ASTM D 490, specifications for coal tar pitch emulsion (CTPE) pavement sealer.

Environmental Considerations
SealMaster Coal Tar E-Z Stir does not contain asbestos. Coal Tar E-Z Stir is an environmentally friendly water based pavement sealer containing less than 50 grams per liter volatile organic content (VOC).

Physical Chemical Properties
SealMaster Coal Tar E-Z Stir is a premium quality pavement sealer that meets the following material requirements when tested in accordance with ASTM D 140, ASTM D 466, ASTM D 490, ASTM B117, ASTM D 529, ASTM D 2939, and ASTM D244 procedures. (see chart below)

Installation
Surface must be clean and free from all loose material and dirt. Pavement surface repairs should be made with a suitable hot or cold asphalt mix. Cracks should be filled with SealMaster hot pour or cold applied crack fillers. Treat all grease, oil, and gasoline spots or stains with SealMaster Petro Seal™ or Prep Seal™.

TEST
Material
Non Volatiles %
Ash Non Volatiles %
Solubility of Non Volatiles in CS2 %
Specific Gravity 25ºC
Drying Time
Adhesion & Resistance to Water
Resistance to Heat
Flexibility
Resistance to Impact
Resistance to Volatilization
Specifications
Material shall be homogenous and show no separation or coagulation that cannot be overcome by moderate stirring.
40% Minimum
40-70%
20 min.
1.30 Minimum
8 hr. Max
No Penetration or Loss of Adhesion
No Blistering or Sagging
No Cracking or Flaking
No Chipping, Flaking, or Cracking
10% Loss in Weight Max.
Result
PASSES
PASSES
PASSES
PASSES
PASSES
PASSES
PASSES
PASSES
PASSES
PASSES
PASSES

Methods
SealMaster Coal Tar E-Z Stir shall be applied by either pressurized spray application equipment or self-propelled squeegee equipment. Pressurized spray equipment shall be capable of spraying pavement sealer with sand added. Equipment shall have continuous agitation or mixing capabilities to maintain homogeneous consistency of pavement sealer mixture throughout the application process. Self-propelled squeegee equipment shall have at least 2 squeegee or brush devices (one behind the other) to assure adequate distribution and penetration of sealer into bituminous pavement. Hand squeegees and brushes shall be acceptable in areas where practicality prohibits the use of mechanized equipment.

Mixing Procedure
SealMaster Coal Tar E-Z Stir is a ready to use product that contains sand. Simply stir material and apply.

Application
For optimum performance and durability apply two coats of SealMaster Coal Tar E-Z Stir. A third coat of Coal Tar E-Z Stir may be applied to high traffic areas such as entrances, exits, and drive lanes.

Application Rate
Apply Coal Tar E-Z Stir at a rate of .11 to .13 gallon per square yard (70-82 square feet per gallon) per coat.

Estimating Material Requirements
One gallon of Coal Tar E-Z Stir will cover approximately 70-82 square feet (7.8 to 9.1 square yards) per coat when mixed and applied properly.

Note
Coverage rates may vary due to pavement age and porosity.

Precautions
Both surface and ambient temperature shall be a minimum of 50ºF in a 24 hour period following application. New asphalt surfaces should be allowed to cure a minimum of four weeks under ideal weather conditions (70ºF) before applying Coal Tar Concentrate. Keep out of reach of children. Do not store unopened drums or pails in freezing temperatures.

Warranty and Disclaimer
The statements made on this technical data sheet are believed to be true and accurate and are intended to provide a guide for approved application practices. As workmanship, weather, construction, condition of pavement, tools utilized, and other variables affecting results are all beyond our control, the manufacturer warrants only that the material conforms to product specifications and any liability to the buyer or user of this product is limited to the replacement value of the product only. The manufacturer expressly disclaims any implied warranties of merchantability or fitness for a particular purpose.